Project 2 - TWO STORY BUILDING PAINTING

Image
Project Name TWO STORY BUILDING PAINTING Document Project Implementation Report
Category Darkness To Light Duration 2 months
Estimated Budget 316,160.00/= Actual Cost 738,000 .00/=
Sponsorship Alumnus from England Type 316,160.00/=
Kansai Paint Type 150,000.00/=
Direct Fund Type 271,840.00/=
OB Coordinator(s) Jan Samaranayake, Shalitha De Soysa, Chaminda Ukwatta
Sponsorship contact(s) Mr. Mangala's Friends from UK

Overview and Objectives

A brilliant alumnus from England contributed to the renovation of the main building which is considered to be the identity of the school.  Also, as usual, Kansai sponsored the coating.

Services/Materials Finished

  1. Existing roof rectification (to avoid rain coming interior).
  2. Suspended ceiling & painting the ceiling.
  3. Internal walls have been painted.
  4. A sink and a pantry and required plumbing with water supply and drainage.
  5. Painting the floor.
  6. Entrance pathway arrangement.

Costs

1. Costs involved with Hardware material purchases.
Goods/Services Date Cost
1 Inside painting labor charge 18/12/2018 60,000.00
2 Outside painting and Roof Painting Labor Charge 19/12/2018 80,000.00
3 Door Window Repairing with Roof 20/12/2018 100,000.00
4 Roof Flashing Work 21/12/2018 140,000.00
5 Meson Work 22/12/2018 40,000.00
6 Wiring (Casing work) Labour + Equipment 23/12/2018 100,000
7 Paint Cost (Inside + Outside + Roof) (Sponsored by Kansai) 23/12/2018 150,000
8 Door and Window Painting 23/12/2018 68,000
Total 738,000
2. Funding
Description Date Cost
1 Mr. Mangala's friends from UK 18/12/2018 316,160.00
2 Paint Cost (Inside + Outside) (Sponsored by Kansai) 18/12/2018 150,000.00
3 Darkness to Light Direct Funds 18/12/2018 271,840.00
Total 738,000.00